Home > News > Content
Construction Sequence of Soil Concrete
Jan 17, 2017

Soil concrete site installations consist of storage containers, sils and a compact mixing and  pumping unit. Several high pressure hose connections and control cable lines connect the pumping unit with the drilling rig at the installation point. The mast length of the rig varies from 2.0m in cellars of shaft sand up to 35.0 m in open areas. The bore points are normally located in small trenches equipped with sludge pumps. From there the excess material, water-cement-soil mixture is pumped to setting ponds or tanks.

 

Our constant hot-selling product, XL-50 Full hydraulic crawler anchor drilling rig, are one of the most important component for above process. With advanced and stable hydraulic systems, it could have more extended life than others, and be your best partner for business.




Products List